Case Studies

Substation design – Addenbrookes, UK

Construction Date

2012

Category

Design, UK

Client

Power On Connections

Electrical design of a 24 MVA 33/11 kV substation to provide supply to a private 11 kV network at Addenbrookes/Medi Centre, Cambridge. The work included the design and specification of transformers, 11 kV and 33 kV switchgear and associated equipment.

Construction Date

2012

Category

Design, UK

Client

Power On Connections