Case Studies

132 kV Wind Farm Connection,Galsworthy, UK

Construction Date

2013 – 2014

Category

Design, UK

Client

Ecotricity

Energypeople Limited was employed by Ecotricity to carry out on site electrical design and connection to the transmission/distribution network (at 132 and 33 kV) for Enercon 4 x 2.3 MW Turbines. Also acted as Owners’ Engineer during the construction and commissioning phases.

Construction Date

2013 – 2014

Category

Design, UK

Client

Ecotricity